Services

What We Build

Renovations, additions, and outdoor spaces for Charlotte homeowners, run by a licensed general contractor who takes a small number of projects at a time.

Renovation should feel like a managed project, not a leap of faith.

Most renovation stories that end badly have nothing to do with craftsmanship. They end badly because nobody was watching the budget, because a decision sat unanswered for three weeks, or because the homeowner found out about a problem long after it could have been easily resolved.

BP Craft Builders is built around fixing that. Every project gets a written scope before work begins, a written update every Friday while it is underway, and one person, the owner of the company, accountable from the first walkthrough to the final punch list. The work is beautiful because the people doing it are good at their crafts. The experience is calm because someone is managing it.

  1. 01Kitchens and Bathrooms
  2. 02Built-Ins and Entertainment Walls
  3. 03Porches, Decks, and Outdoor Living
  4. 04Garages, ADUs, and Pool Houses
  5. 05Additions and Room Extensions
Illustration of a bathroom with a tiled walk-in shower and a white oak vanity in morning light
Waterproofing · behind the tile
Illustration
01

Kitchens and Bathrooms

The rooms you use every day, and the ones where planning matters most. Whether the job is new finishes or a reworked layout, the result depends on decisions made before demolition starts. The work you will never see, waterproofing, blocking, ventilation, and rough-in, is the work that determines whether the room still looks right in ten years. Inside the wall: done correctly, photographed before it closes, and yours to keep.

Includes

  • Full and partial remodels
  • Layout changes
  • Cabinetry coordination
  • Tile and countertops
  • Fixtures and lighting
  • Tiled showers and waterproofing
  • Accessibility upgrades
Illustration of painted built-in bookcases fitted flush against a smooth wall beside a painted brick fireplace
Scribed to the wall
Illustration
02

Built-Ins and Entertainment Walls

Cabinetry and millwork built for the room it lives in rather than ordered to fit it. Every wall in an older Charlotte house is a little out of plumb, and built-ins are where that shows. These projects are scribed and fitted on site, with wiring concealed but still reachable when something needs to be serviced.

Includes

  • Entertainment and media walls
  • Fireplace surrounds
  • Floor-to-ceiling shelving
  • Home office built-ins
  • Mudroom lockers
  • Window seats and benches
Illustration of a hardwood deck with black metal railings on the back of a modern craftsman house at sunrise
Ledger · flashed
Illustration
03

Porches, Decks, and Outdoor Living

The parts of the property that get used from March through November. New builds, rebuilds, and expansions, with the structural details done properly: correctly sized footings, flashed ledgers, and code-compliant railings. Those details are invisible on the day the job finishes and they are the entire difference between a deck that lasts five years and one that lasts twenty-five.

Includes

  • Screened porches
  • Deck builds and rebuilds
  • Patios and hardscape
  • Pergolas and covered structures
  • Outdoor kitchens and grilling stations
  • Fire features
  • Exterior lighting
  • Fencing and gates
Illustration of a detached garage with an apartment above whose roofline matches the brick house behind it
Roofline · matched to the house
Illustration
04

Garages, ADUs, and Pool Houses

Detached structures that need to look like they belong to the house rather than like something added later. Roofline, siding, trim, and window proportions get matched to the existing home. Accessory dwelling units carry their own permitting and code requirements in Charlotte, and those get confirmed before design rather than discovered during inspection.

Includes

  • Detached and attached garages
  • Accessory dwelling units
  • Pool houses and cabanas
  • Workshops and studios
  • Garage conversions
Illustration of a family room with a painted brick wall along one side, a beamed ceiling, and a wall of windows
Tied into the existing house
Illustration
05

Additions and Room Extensions

More space without moving. An addition is planned and built to feel like it was always part of the house, matched in structure, roofline, finish, and flow. These are the largest projects taken on here, and they are taken on one at a time so that the attention they require is actually available.

Includes

  • Room additions and bump-outs
  • Sunrooms
  • Second-story additions
  • Expanded kitchens and primary suites

The record

The Record of What Is Behind Your Walls

Inside the wall: done correctly, photographed before it closes, and yours to keep.

Before the drywall goes up, every wall gets photographed. Framing, wiring, plumbing, blocking, insulation. That record goes in your closeout package and it stays yours.

Most homeowners never see what is behind their own walls. You will have a photograph of every square foot of it, and the next person who opens one of those walls, whether that is in four years or fourteen, will be very glad you do.

Your permit inspection records are handed over alongside the photographs. The inspections are independent verification that the work was done correctly. The photographs are the record of exactly what it looked like.

I also write the one-year workmanship warranty, which means I am the one who comes back. That is a considerable incentive to get the parts you cannot see right the first time.

1 2 3 4 5
  1. Framing
  2. Wiring
  3. Plumbing
  4. Blocking
  5. Insulation

Five photographs, added to your closeout package.

Time

What Drives Your Timeline

Homeowners usually ask how long a project takes before there is enough information to answer honestly. Here is what actually determines it.

01

Selections.

This is the largest variable and the one you control. A project where tile, fixtures, and cabinetry are chosen early runs on schedule. A project where those decisions arrive late stalls, and it stalls at the most expensive possible moment, with trades already scheduled.

02

Lead times.

Cabinetry is almost always the longest, and custom windows, specialty tile, and certain appliances are not far behind. These are ordered as early as the design allows. A six week lead time you knew about in week one is a scheduling detail. The same lead time discovered the week you needed the item is six weeks you cannot get back.

03

Permitting and inspections.

Review times in Mecklenburg County vary with scope and with how busy the department is. Structural work, additions, and accessory dwelling units take longer than finish work.

04

Trade sequencing.

Every trade has to finish before the next can start. Most schedule problems on a job site are sequencing problems, and sequencing is the part I manage most closely.

You will get a schedule with real dates in your proposal, once your scope is defined and lead times are confirmed. I would rather give you a date I can hold than a range that sounds good on a website.

Money

How Pricing Works

Scope gets written, not assumed.

01

Scope and estimate

Every project starts with a written scope and an estimate priced by phase. You will see what is included and what is not, described in detail, before you commit to anything.

02

Allowances

Anything you have not selected yet, such as tile, fixtures, cabinetry, appliances, or lighting, is carried as a named allowance with a dollar figure attached. Allowances are reconciled in both directions. If your selection comes in under the allowance, the difference comes back to you. If it comes in over, you will know before you commit rather than at the end.

03

The whole project

Your proposal describes the whole project, priced as a whole. The pieces are sequenced and dependent on each other, so removing one rarely reduces the total by what it appears to be worth. If the budget needs to come down, I will show you where it can come down and what each option costs you in durability or finish.

04

Change orders

Nothing is added to your project without a written change order you approve first. If something is discovered behind a wall, you will hear about it the day it is found, along with the options. Firm pricing follows as soon as there are real numbers from the trades.

05

Payments

Payments are tied to completed milestones rather than to the calendar. At each payment you receive signed lien waivers from the trades who were paid, so there is never a question of whether someone could place a claim against your home.

How a named allowance reconciles

Example

Under the allowance: the difference comes back to you.

Over the allowance: you know before you commit.

The named allowance

Not sure which category your project falls into?

Most projects do not fit neatly into one. Tell me what you are thinking about and I will come look at it and give you an honest opinion, whether or not it turns into work for me.

Request a Walkthrough